
WEIGHT: 60 kg
Bust: SUPER
1 HOUR:250$
NIGHT: +60$
Services: Sex vaginal, Striptease, TOY PLAY, Gangbang / Orgy, Role Play & Fantasy
This article is the subject of a legal complaint made on behalf of ArcelorMittal. Global steel giant ArcelorMittal is failing to meet minimum environmental standards at its massive plant in central Bosnia, a Guardian Cities investigation has learned.
The vast Zenica steelworks is operating without valid permits and a number of pledged improvements to reduce emissions from the factory have not been made [see footnote].
But a decade on, much of this work has not been completed. As she speaks, a huge cloud of thick dust drifts overhead. Regimented rows of plums, peaches, pears and strawberries are covered in a thin film of grey ash. I bring it in on my shoes. It is killing us. Zenica is a city of around , dominated by steel. The prevailing wind often carries carries fat reels of smoke and dust from the towering blast furnaces and needle-thin chimneys that puncture the skyline.
On a bad day, even drawing a breath can be a struggle. Downtown, electronic displays erected atop the slate-grey communist-era apartment blocks measure the amount of sulphur dioxide SO2 in the air [see footnote]. In , levels of this toxic gas โ which comes from burning coal โ exceeded EU safe limits times.
The Zenica steelworks first opened at the tail-end of the 19th century, when Bosnia-Herzegovina was a restive part of Austro-Hungarian empire.